Télécharger Imprimer la page

Goetze 2140 Mode D'emploi page 18

Vanne d'arrêt, clapet anti-retour, filtre

Publicité

Table 1
Torque
DN10
DN15
DN20
DN25
DN32
DN40
DN50
6
Putting into service
Putting a system into service may only be performed by qualified persons. All operating
instructions must be read and followed before putting into service for the first time.
In addition, it must be checked that the installation work was performed correctly.
WARNING: The pipe system must be vented, as air bubbles can lead to explosions
if pressure is suddenly built up. Therefore, the operating pressure should be built
up in stages.
Application errors can result in danger to life due to parts that come loose!
Assembly and maintenance instructions - 2140 / 2180 / 2142 / 2182 / 2143 / 2183 | Version: 06/2023 · V02
Cylinder head
screw
M8
M8
M10
M10
M12
M12
M10
Tightening sequence
2140, 2142,
2143 (Nm)
34
34
55
55
75
75
55
2180, 2182,
2183 (Nm)
22
22
43
43
46
56
52
www.goetze-group.com

Publicité

loading

Ce manuel est également adapté pour:

21802142218221432183