A. Counter loop system installation (DCL20-K)
The coil provided in the DCL20-K kit produces a magnetic field shinning over a 1,2 meter perimeter which
enables a person to receive comfortably the signal.
The loop can't be placed under a metallic structure such as cash register. The magnetic
field would be absorbed by the metallic mass which could not equip the counter properly.
It exists other solutions for the installation of a loop in a metallic counter (see below)
The pictogram panel with integrated loop can be
fixed on the reception desk and the loop can be
placed on the client side to avoid disruptions due
to metal.
Installation of the loop on the ground,
B. Installation of a loop system in a room (DCL20)
Coverage :
The DLC20 amplifier covers a 25 m² x 5m x 5m square room. If the room is rectangular, the unit will cover
60m² (10m x 6m)
The loop wire must be placed on the ceiling (heigh 3m), in a baseboard or on the ground around the room
or on a bounded area (example : row of seats).
If the ground contains a lot of steel or aluminum, or if the wire is placed higher than 3m, then the
coverage will be substantially reduced (approximatively 20% per additionnal meter).
For a better reception, we recommend you to place the loop on the ground or in a fake ceilling if it is
lower than 3,5m.
For a wider coverage around the counter, you can
install a wire on the ground. The loop can be
placed in the slab (under the metallic latice),
under a coating (parquet, carpet ... etc) thanks to
a copper roller or stuck under a floor mat.
See adjacent example
Installation example