Commissioning The Heater - Bradford White KwickShot TEF024V120 Guide D'installation Et Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BEFORE SWITCHING THE ELECTRICAL BREAKER "ON", VERIFY THE INLET AND OUTLET
BALL VALVES ARE FULLY OPEN AND WATER IS FLOWING THROUGH THE HOT WATER
FAUCET FOR A MINUTE OR TWO UNTIL THE FLOW IS CONTINUOUS AND FREE FROM AIR POCKETS. DO
NOT SWITCH THE BREAKER "ON" IF THERE IS A POSSIBILITY THE WATER IN THE HEATER IS FROZEN.
Verify water is flowing through the faucet.
Switch "ON" the electric power supply at the breaker.
The following steps are dependent on the water heater, please be sure to read all instructions to best commission the
appropriate model.
KwickShot® Flow Controlled Models
The LED indicator light will flash rapidly while water flows through the unit.
Maintain flow.
After 15 seconds, the LED indicator light will turn solid red and there will be an
audible click.
The heater is commissioned at this point. The faucet can be turned off and
used as needed.
Note: with no flow, the unit will flash every 4 seconds, indicating normal stand-
by mode.
KwickShot® Thermostatic Models
Keep water flowing through the faucet for the next step.
The display on the circuit board should come "ON". With the flow running, the
heater will go through the 60 seconds startup/self-calibration procedure. The
display will count down from 60 to 0. When the display timer reaches 45, the
unit starts heating and continues counting down to 0.
After the 60 seconds in step 4, the display will show the temperature setpoint.
See The heater is commissioned at this point. Faucet can be turned off
and used as needed.
Note: the temperature display will turn off after 5 minutes of inactivity. Display
turns on when water flows through heater.
Information contained in this document is subject to change without notice.
SECTION 5: COMMISSIONING THE HEATER
238-54367-00A REV 09/21
9

Publicité

Table des Matières
loading

Table des Matières