Télécharger Imprimer la page

Rothenberger RODRUM M/L Instructions D'utilisation page 21

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
which the electric power tool is switched and those in which it is switched on but not running
under load).
3
Scope of delivery
- Pipe cleaning machine RODRUM M/L
- Guide tube
- Operating manual
- Tool case (according to the version)
4
Power connection
Connect only to the single-phase alternating current indicated on the rating plate. Connect only
to sockets with protective contacts. The machine must be operated only through a ground fault
circuit with max. 10 - 30 mA rated leakage current.
Always perform the operational test before starting up the device. If there is a repeated failure,
have the connected device inspected.
Please keep in mind that this device cannot replace fundamental safety precautions. To prevent
life-threatening hazards, be sure to use electrical devices only as intended.
Reliable personal protection against electric shock. Fault currents are recognized in a fraction of
a second, and the current supply is immediately interrupted. The risk to humans and animals is
drastically reduced.
- Never use the electric tool without a PRCD.
- The plug or electrical cord should be replaced only by the manufacturer of the electric tool or
by its repair service.
- Keep water away from electrical parts of the electric tool and from people in the work area.
4.1
Putting the PRCD switch into operation
Only suitable for AC current! Note the mains network voltage!
Perform the following test procedure on the PRCD switch before every putting into operation of
the device:
1. Connect the PRCD plug connector with the socket.
2. Press on RESET. The indicator switches to ON.
3. Pull the plug connector out of the socket. The display switches itself off.
4. Repeat 1. and 2.
5. Press on TEST. The indicator switches itself off.
6. Press on RESET to switch the device on.
These protective device protect against faults in the attached device, not against
such faults in the preceding plant!
5
Function of the Unit
5.1
Overview
Guide tube
1
Lever
2
Feed unit
3
Foot switch
4
Drum
5
5.2
Transfer
Tool box
6
Locking bolt
7
Network cable with PRCD
8
Couplings (on the left: 20 mm square; on the right: 16 mm
9
T-groove)
ENGLISH
(A)
15

Publicité

loading

Ce manuel est également adapté pour:

12000016161200001617120000161812000016191200001620