Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and Operating Instructions
CHAPTER 4

INSTALLATION

NOTE
Facade panel – KWL 45-160 FB/FBT
4 .0
Installation
When using the deep facade panel, the wall installation sleeve must protrude 50 mm on the outside of the wall.
Installation steps:
1. Loosen panel locking screw (do not completely remove).
2. Remove panel.
3. Align frame concentric to the wall installation sleeve.
4. Mark and drill the hole pattern (see Fig. 3).
5. Align frame horizontally, with the arrow pointing up, (see Fig. 3) and screw to the wall (use stainless steel screws).
6. Hang the panel on the top of the frame and push to the right up to the stop (see Fig. 4).
7. Close panel and fix with locking screw (see Fig. 4).
OUTSIDE OF WALL
All subsequent installation steps for the installation of the EcoVent Verso ventilation unit can
be found in the installation and operating instructions for the KWL EC 45-160 unit!
Fig .3
OUTSIDE OF WALL
4
EN
Fig .4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kwl 45-160 fbtKwl 45-160 fbt-wKwl 45-160 fb-e

Table des Matières