Tank Leak Test Setup Screen 1 - Veeder-Root TLS2 Mode D'emploi

Masquer les pouces Voir aussi pour TLS2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 136
TLS2 Setup

[112-114] Tank Leak Test Setup Screen 1

Legend for numbered boxes
The Tank Leak Test Setup allows you to establish and enter
the method, timing, and duration of automatic leak tests.
You must have a Mag 1 or 2 probe installed to perform leak
tests.
If you are using the In-Tank Leak Test feature for
underground storage tank regulatory compliance, be sure
the leak test limits you establish and enter comply with the
test type, accuracy, and frequency requirements as defined
by local, county, state, federal and any other regulatory
authority governing your site.
In addition, set the test time for a period when no fueling
from or bulk delivery to the tank will occur. Such activity
during a leak test procedure will result in inaccurate leak
test results.
1
Test Rate [112] - You can set the leak test rate at 0.2
gph (0.76 lph) (default) or 0.1 gph (0.38 lph). Selecting
0.1 gph (0.38 lph) requires a Mag 1 probe. Touch the
Down Arrow button to the right of the window and enter
the desired choice.
2
Early Stop [113] - Disabled is the default setting. When
enabled this feature will prevent an In-Tank Leak Test
from starting under the following conditions:
• Tank volume is less than Leak Min Periodic vlaue or
Leak Min Annual value.
• It is less than 8 hours from a delivery.
• The product temperature is less than 0°F (-17.6°C)
or more than +100°F (+37.4°C).
44
01-01-2000
ALL FUNCTIONS NORMAL
12:00 AM
1
[112]
2
EARLY STOP
[113]
3
[114]
1
2
[112-114] Tank Leak Test Setup Screen 1
4
SAME ALL TANKS
TANK 1
0.2 GPH
3
4
5
• There is too little fuel in tank.
Touch the Down Arrow button to the right of the
window and enter the desired choice.
3
Test Duration [114] - The maximum duration is 24
hours. There is a minimum duration of two hours for
0.2 gph (0.76 lph) tests and three hours for 0.1 gph
(0.38 lph) tests.
Note: If you have Early Stop enabled and the console
determines that an Tank Leak Test has passed the
test is completed before the duration times out.
Default duration is 2 hours. Touch the Down Arrow
button to the right of the window and enter the desired
choice.
4
Same All Tanks button - Touch this button to transfer
identical selections made on this screen for Tank 1 to
All Tanks (opens the confirm Same All Tanks Screen
on page 45).
The Tank Leak Test setup concludes on page 46.
6

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emc2

Table des Matières