Start Up Instructions; List Of Materials; Mounting The Machine - Garland ULTIMATE 818 LE Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 36
English

5. START UP INSTRUCTIONS

5.1. LIST OF MATERIALS

This machine includes the following elements that you
will find included in the box:
• High pressure machine
• Handle with cable winder
• Adjustable water jet
• Lance turbo
• Gun
• Wire for lance cleaning
• Instruction manual

5.2. MOUNTING THE MACHINE

1. . Mount the hose joint.
Make sure that the filter is in place (5a) before
mounting the hose joint. This filter is vital to avoid the
entry of impurities that could damage the pump of the
machine.
2. Connect the water entry hose using a quick
connector.
3. Connect the gun to the other high pressure
terminal.
4. Connect the lance to the gun.
5. Connect the cable to the mains.
5.3. VERIFICATION POINTS PRIOR TO USE
The current supply and its related tension must be
those stipulated on the characteristics label.
Check the machine and look for lose pieces
(screws, nuts, covers etc) and for any
28/96

Publicité

Table des Matières
loading

Table des Matières