Ashley DVAG11 Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
3. Insert the two provided rubber grommets (v)
into the lower bracket as shown in figure 6a.
Place the hanging bracket over the square hole.
Check to see the bracket is level. After leveling
the hanging bracket, mark the four holes as
shown in figure 6b.
X 2
Figure 6a
FLOOR
4. Remove the hanging bracket and drill the
four holes using a
masonry drill bits size must match the size of
the masonry screw that will be used (masonry
screws and drill bit not
The four 1/4" spacer washers (iv) provided must
be put between the bracket and the wall.
v
Figure 6b
masonry drill bit. NOTE: The
included). IMPORTANT:
X 4
INSTALLING THE HANGING BRACKET
ON A COMBUSTIBLE WALL (I.E,
DRYWALL/WOODEN WALL)
1.
Remove the required heat shield from the box
and fold it as indicated in the illustration (fold
along the perforated lines and break off when
installing in a 2 X 4 wall). Align the holes on the
heat shield with the holes on the mounting
bracket and attach using the six provided small
screws (vi).
X 6
9
© 2021 United States Stove Company
iv
Perforated Line for 2X4
Installation
vi

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dvag17Dvag30

Table des Matières