Preparation; Installing The Mounting Bracket - Faro Ovni 33135 Installation Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 16
INSTRUCCIONES DE SEGURIDAD / INSTRUCTION DE SÉCURITÉ / SAFETY INSTRUCTIONS / INSTRUÇÕES DE SEGURANÇA / SICHERHEITSHINWEISE /
INSTRUCCIONES DE SEGURIDAD / INSTRUCTION DE SÉCURITÉ / SAFETY INSTRUCTIONS / INSTRUÇÕES DE SEGURANÇA / SICHERHEITSHINWEISE /
INSTRUCCIONES DE SEGURIDAD / INSTRUCTION DE SÉCURITÉ / SAFETY INSTRUCTIONS / INSTRUÇÕES DE SEGURANÇA / SICHERHEITSHINWEISE /
VEILIGHEIDSINSTURCTIES / INSTRUZIONI DI SICUREZZA / Ο∆ΗΓΊΕΣ ΑΣΦΑΛΕΊΑΣ / ИНСТРУКЦИИ ПО ТЕХНИКЕ
VEILIGHEIDSINSTURCTIES / INSTRUZIONI DI SICUREZZA

PREPARATION:

Verify you have all parts before beginning the installation. Check foam insert closely for missing parts.
Verify you have all parts before beginning the installation. Check foam insert closely for missing
avoid damage to finish, assemble motor on soft padded surface or use
avoid damage to finish, assemble motor on soft padded surface or use the original foam inset in motor box.
Do not lay fan on its side as this could result in shifting of motor in decorative enclosure.
Do not lay fan on its side as this could result in shifting of motor in decorative enclosure.

INSTALLING THE MOUNTING BRACKET:

Caution:
To avoid possible electrical shock, be sure electricity is turned off at the main power
To avoid possible electrical shock, be sure electricity is turned off at the main power
box before writing. All wiring must be in accordance with National and Local Electrical
wiring must be in accordance with National and Local Electrical
Codes and the ceiling fan must be grounded as a pre
shock.
1- Locate ceiling joist where fan is to be mounted, being sure location agrees with the
Locate ceiling joist where fan is to be mounted, being sure location agrees with the
requirements in the minimum clearance safeguards section of the guide. Wood joist
requirements in the minimum clearance safeguards section of the guide. Wood joist
must be sound and of adequate size to suppor
must be sound and of adequate size to suppor t a 35- Ib load.
2- If not already present, mount a UL listed outlet box marked "suitable for fan support"
If not already present, mount a UL listed outlet box marked "suitable for fan support"
following the
instructions provided with the outlet box. The outlet box must be able to support a
instructions provided with the outlet box. The outlet box must be able to support a
minimum of 35 Ibs.
3-Attach hanger bracket to out let box using 2 machine screws provided with the outlet
box(Fig.1)
INSTALLING THE FAN
ATTACHING DOWNROD, CANOPY AND COLLAR COVER (FIG.2)
ATTACHING DOWNROD, CANOPY AND COLLAR COVER (FIG.2)
1. Remove ball from downrod by loosening
set screw in the side of the ball. Slide ball
down and remove ball pin; remove ball.
2. Feed the 3 wires from top of fan through
either end of downrod and set end of
downrod into mounting collar.
3. Insert downrod pin through holes in
mounting collar and downrod; slip cotter pin
through small hole in end of downrod pin in
place.
4- Tighten security screws against downrod
using a large flat blade screwdriver to
ensure a tight fit against downrod.
NOTE: Fan has 6 feet of hook-up wire in
case you are using an extension downrod.
Wires can be cut so only 8 inches or so
extend beyond the top of the downrod to
make the electrical connections easier and
safer.
5- Feed wires through collar cover and slide
collar cover over downrod to top of fan.
Connect wires (A) from top of fan to wires
(B) in collar cover by snapping two halves of
wiring harness together. ( Align 2 ridges and
grooves inside connectors- they wil l only snap together one way.) Secure collar cover to downrod with set screw on top edge of collar
cover.
6- Feed wires through canopy and slide canopy over downrod to lay on top of collar cover. It will be attached to ceiling later.
Feed wires through canopy and slide canopy over downrod to lay on top of collar cover. It will be attached to ceiling later.
Feed wires through canopy and slide canopy over downrod to lay on top of collar cover. It will be attached to ceiling later.
7- Feed wires throught ball and slide ball over downrod, past hole in end of downrod. Insert ball pin (removed in Step 1), slide ball up
ball and slide ball over downrod, past hole in end of downrod. Insert ball pin (removed in Step 1), slide ball up
ball and slide ball over downrod, past hole in end of downrod. Insert ball pin (removed in Step 1), slide ball up
and tighten ball's set screw to secure ball in place.
and tighten ball's set screw to secure ball in place.
grounded as a pre caution against possible electric
let box using 2 machine screws provided with the outlet
l only snap together one way.) Secure collar cover to downrod with set screw on top edge of collar
l only snap together one way.) Secure collar cover to downrod with set screw on top edge of collar
ТЕХНИКЕ БЕЗОПАСНОСТИ
parts. Remove motor from packing. To
the original foam inset in motor box.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ovni 33136Ovni 33137

Table des Matières