Tools And Materials; Before You Begin - Kohler Mach Tripoint 10TD00N10-CP Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Tools and Materials

Solder
Sealant Tape

Before You Begin

Follow all local plumbing and building codes.
The appearance of your product may differ from the product illustrated. The
installation instructions still apply.
For adequate water flow, use the proper sized supply pipe for each fixture. Refer to
the "Roughing-In" section.
For retrofit (RF) models: Remove the existing valve body and start at the "Install the
Valve Body" step.
For touchless models with top-mount sensors:
• The area above the sensor must be clear of objects.
• Do not install a light fixture above the sensor.
• Use a split grab bar for ADA installations.
Turn the main water supply OFF.
1339618-2-C
Kohler Co.
3

Publicité

Table des Matières
loading

Table des Matières