Stiebel Eltron HSBC 300 cool Utilisation Et Installation page 41

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATIoN
Preparation
Joining appliance sections
Rejoin the appliance sections in reverse order.
The positioning aids and the dotted line marking provide assis-
tance when positioning and inserting the upper appliance section
into the guide groove on the lower section:
5
1 Handle
2 Guide pin
3 Dotted line (perforation in the panel)
4 Guide groove
5 Positioning aid
1 Dotted line (perforation in the panel)
f Place the upper appliance section onto the lower appliance
f
section along the dotted line.
www.stiebel-eltron.com
1
f Slide the upper appliance section to the back until it is flush
f
with the lower appliance section. If the appliance sections
are joined correctly, the final position is determined by the
2
guide groove and guide pin.
f Secure the tabs on the appliance front.
f
3
f Fit the side profile strips.
f
f Fit insulation segment 3 and the 4 hydraulic hoses.
f
f Connect the push-fit connectors of the 4 hydraulic connec-
f
4
tions. Ensure that the spring clips click into place.
f Insert the "heating sensor" at the buffer cylinder.
f
f Lay the sensor lead in the guide groove provided for this
f
purpose.
f Fit insulation segment 2.
f
f Fit insulation segment 1.
f
f Fit the front casing.
f
1
HSBC 300 cool | HSBC 300 L cool |
41

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hsbc 300 l cool

Table des Matières