Overview; Installation; Overhead Rigging - EuroLite LED PAR-56 RGB Spot Short Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OVERVIEW

1

INSTALLATION

Overhead rigging

Please consider the EN 60598-2-17and the respective national standards during the installation!
The installation must only be carried out by an authorized dealer!
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
All manuals and user guides at all-guides.com
2
3
4
5
DANGER TO LIFE!
17/42
(1) Power cable with safety plug
(2) Fixation screws
(3)
Mounting-bracket with hook
attachment
(4) Hole for safety rope
(5) LEDs
00023798.DOC, Version 2.2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

5191362051913625

Table des Matières