hestan GFDSR241 Manuel D'installation page 16

Masquer les pouces Voir aussi pour GFDSR241:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION OF DISPENSING EQUIPMENT
10. On the right rear sidewall there is a
double column of screws. Remove
EN
the left screw. Locate the safety
chain and a #10 x 1/2" sheet metal
screw from the parts bag. Insert the
screw through the closed end link of
the chain and tighten in the vacant
screw hole. The chain can now be
used to secure the CO 2 cylinder with
"S" hook, preventing damage to the
regulator.
11. CO 2 cylinders are shipped empty
and must be filled prior to use. Turn
the adjusting knob on the regulator
counter-clockwise until the outlet
pressure gauge (top) reads zero. Make
sure that the valve at the bottom of
the regulator where the red hose is
connected, is in the OFF position
as shown on page 18. Watching
the outlet pressure gauge, turn the
regulator adjusting knob clockwise
until the pressure is at 15 psi.
Adjustments can later be made based
on flow rates.
IMPORTANT:
MUST be made when the shut-off valve is
in the OFF position!
12. Locate the beer faucet(s) and install
onto the dispensing head shanks.
Tighten with supplied spanner wrench.
Install black handle(s) onto faucet(s).
16
©2021 Hestan Commercial Corporation
All pressure adjustments
(continued)

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Gfdsr242

Table des Matières