Product Description; Assembly; Blower Pipes - Maruyama BL3200 Manuel D'opérateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Product Description

1. Pipe B
2. Pipe A
3. Air Intake Screen
4. Stop Switch
5. Throttle Setting Lever
6. Throttle Trigger
7. Handle
8. Fan Cover
9. Fuel Tank
10. Recoil Starter
11. Air Cleaner
12. Engine
13. Serial Number
(on the top of crankcase)

Assembly

Blower Pipes Installation
BL3200, BL32 and BL32-1
1. Align groove in pipe A with pegs on blower housing
and slide pipe A on to housing.
2. Rotate pipes A clock wise to lock it into place.
3. Align groove in pipe B with pegs on pipe A and slide
pipe B until proper position.
Rotate pipe B clockwise to lock it into place.
4.
US- 9 -

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bl32Bl32-1

Table des Matières