Operating Interface - Bunn Sure Immersion 220 Guide D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Scan to register your machine on BUNNlink
customer care alerts, reports and further support.
Please provide this QR code to the customer or
manager of the site.
NOTE: The machine comes pre-loaded with four (4) recipes; two (2) hot beverage, and two (2) cold beverage.
1. The first screen to appear is a "User" interface
screen, also known as the beverage "Carousel".
Drink selections viewable are accessed by
swiping left or right across the screen, or by
touching the arrows located on the left and right.
Press the desired drink icon to select.
2. Once a selection has been made by touching
the screen, the user is prompted to select the
desired beverage size, and then to place the
beverage container (cup) on tray below. The
user will then touch the "START" button on
the screen to begin.
NOTE: If the beverage selected is an iced
beverage, the screen will prompt the user to
fill the cup with ice prior placing the beverage
container (cup) on the tray.
3. The next screen after pressing the start button
is the "Grinding" screen. The user is shown the
coffee selection and that the coffee beans are
being ground.
NOTE: The user can press the "STOP" during
this process to cancel this beverage.
BUNNlink PRODUCT REGISTRATION
®
for

OPERATING INTERFACE

14
continued >

Publicité

Table des Matières
loading

Table des Matières