Publicité

Liens rapides

ITB/ITCB
ITCB-DV HV
ITCB TWIN HV
Infusion Series
®
INSTALLATION & OPERATING GUIDE
BUNN-O-MATIC CORPORATION OF CANADA
280 INDUSTRIAL PARKWAY S.,
AURORA, ONTARIO, L4G 3T9
PHONE: (905) 841-2866
FAX: (905) 263-2256
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts
Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at
www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and
manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
36748.7003C 12/12 ©2010 Bunn-O-Matic Corporation

Publicité

Table des Matières
loading

Sommaire des Matières pour Bunn Infusion Serie

  • Page 1 To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
  • Page 2 BUNN’S SOLE OPTION AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND. In no event shall Bunn be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental, consequential or punitive damages.
  • Page 3: Table Des Matières

    INTRODUCTION This equipment will brew tea into an awaiting dispenser or reservoir. The ITB uses recipe settings to brew tea. It has an LCD for digital readout and programming. The user is able to select regular or quick brew for tea programming. Other features include Pre-Infusion and Pulse Brew, quick and standard brew, Energy Savings mode, BUNNLink compatible, Freshness Timer, Sanitation Alert, and brew counters.
  • Page 4: User Notices

    FAILURE TO COMPLY RISKS INJURY. VEUILLEZ LIRE LE MANUEL D’EMPLOI AVANT D’UTILISER CE PRODUIT. L’INOBSERVATION DE CES CONSEILS PEUT ENTRAÎNER DES RISQUES DE BLESSURE. PN: 00658.7000G 02/10 © 1985 BUNN-O-MATIC CORPORATION OF CANADA Artwork for P/N: 00656.7000 Artwork Rev: F...
  • Page 5: Electrical Requirements (Itb/Itcb-Dv)

    ELECTRICAL REQUIREMENTS ITB & ITCB-DV Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements. “Optional Field Wiring ratings are located on the machine near the dataplate.” WARNING - The brewer must be disconnected from the power source until specified. WARNING - The power cord must be CSA Listed, Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, Rated 90°...
  • Page 6: Electrical Requirements (Itcb-Dv Hv/Twin)

    ELECTRICAL REQUIREMENTS ITCB-DV HV & TWIN Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements. “Optional Field Wiring ratings are located on the machine near the dataplate.” WARNING - The brewer must be disconnected from the power source until specified. WARNING - The power cord must be CSA Listed, Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, Rated 90°...
  • Page 7: Plumbing Requirements/Optional Sweetener

    NOTE - Bunn-O-Matic recommends 3⁄8" copper tubing for all installations from the 1⁄2" water supply line. A tight coil of tubing in the water line will facilitate moving the brewer to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.
  • Page 8: Operating Controls

    OPERATING CONTROLS ITCB-DV & HV ® ENABLE ON / OFF BREW FULL HALF BREW BREW BREW ITCB-TWIN HV ® ENABLE ENABLE ON / OFF ON / OFF BREW BREW A. ENABLE BREW (ON/OFF) SWITCH Pressing the ENABLE BREW (ON/OFF) switch pad will alternately turn the brewer on and off. Pressing this pad during the brew cycle will interrupt the brew cycle, stopping the flow of water.
  • Page 9: Initial Set-Up

    INITIAL SET-UP Insert an empty funnel into the funnel rails. 205° F (96.1° C) Place an empty server under the funnel. Connect the brewer to the power source. Make sure the ON/OFF switch is ON (LED will be lit). Water will flow into the tank and stop when the tank is filled to its capacity.
  • Page 10: Tea Brewing

    WITHOUT A SMART FUNNEL AND G9-2T DBC GRINDER: 1. Begin each brew cycle with a clean empty brew funnel. 2. Insert a BUNN filter into the funnel. 3. Pour the fresh coffee into the filter and level the bed of grounds by gently shaking.
  • Page 11: Cleaning/Tank Drain

    3. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment. Do NOT clean this equipment with a water jet device. CAUTION – DO NOT KEEP BREWED ICED TEA OVERNIGHT. THE SERVER MUST BE CLEANED DAILY.
  • Page 12: Sanitizing Optional Sweetener

    SANITIZING OPTIONAL SWEETENER All Models: 1. Remove all the quick disconnects (QCD) from all the B.I.B. containers. 2. Fill a suitable pail or bucket with a warm soapy tap water solution. (140° F) 3. Submerge all disconnects (gas and liquid) in the soapy solution and then clean them using a nylon bristle brush.
  • Page 13: Programming

    Left Programming (hidden) switch (just to the left of the display): This is used to scroll backwards through the function list. c) Brew A,B,C (Digital Brewer Control - Twins Only): Used to select options that appear on the display during programming. For more advanced PROGRAMMING information, refer to programming manual at www.bunn.com 36748.3 111010...
  • Page 14 PROGRAMMING THE BREWER The programming of the brewer is divided into two levels. There is one function in Level 1. All other functions are accessed in Level 2. The following function screens are in order of appearance. Each screen will have instructions on how to access and the procedures to program the various functions of the brewer.
  • Page 15 ENABL ENERGYSAVR ENABLE FRESH TIMER REFILL DONE DONE DONE DONE CALIBRATE FLOW? BREW COUNTERS? ENTER ASSET # DILUTE OZ/M: XX.X DONE ENTER SERVICE # FACTORY DEFAULTS SERVICE TOOLS For more advanced PROGRAMMING information, refer to programming manual at www.bunn.com 36748.3 111010...
  • Page 16 ITCB PROGRAMMING FUNCTIONS - FLOW CHART BREW LOCKOUT? PROGRAMMING FUNCTIONS - LEVEL I DONE YES PROGRAMMING FUNCTIONS - LEVEL 2 SET LANGUAGE? UNITS REVIEW RECIPES ASSIGN RECIPE METRIC DONE SET NEW RECIPE? MASTER TEMP 205° READY DEGREE 5° ENABLE ADS? DONE DONE DONE...
  • Page 17 ITCB-DV HV PROGRAMMING FUNCTIONS - FLOW CHART BREW LOCKOUT ? PROGRAMMING FUNCTIONS - LEVEL I DONE YES PROGRAMMING FUNCTIONS - LEVEL 2 SET LANGUAGE ? UNITS REVIEW RECIPES ? ASSIGN RECIPE ? METRIC DONE SET NEW RECIPE ? SET TEMP 200° READY DEGREE 5°...
  • Page 18 ITCB HV TWIN PROGRAMMING FUNCTIONS - FLOW CHART BREW LOCKOUT ? PROGRAMMING FUNCTIONS - LEVEL I DONE YES PROGRAMMING FUNCTIONS - LEVEL 2 SET LANGUAGE ? UNITS REVIEW RECIPES ? ASSIGN RECIPE ? METRIC DONE SET NEW RECIPE ? SET TEMP 200° READY DEGREE 5°...

Table des Matières