Télécharger Imprimer la page

Chapin 82108 Mode D'emploi page 6

Publicité

Les langues disponibles

Les langues disponibles

Step 9 Attaching the Gate Control Rod
a. Slide gate control lever forward and attach hook at bottom of
rod to spring at hopper base
b. Attach gate control rod to upper screw on gate control by
removing the screw first, attaching the rod, and then
re-attaching the screw
Step10:
Both Hand Grips slide onto both the left and right
handle bars. The Grips should Slide right on.
GENERAL OPERATING INSTRUCTIONS
• Be sure gate control is in the closed position.
• Determine appropriate setting for material being used by reading the suggested setting on the material's bag.
• To begin spreading, start walking (about 3 mph pace) and pull the gate control down to open gate.
• To stop spreading simply push gate control up and the gate will close.
STORAGE AND MAINTENANCE
• When finished spreading empty hopper of any remaining material.
• Thoroughly wash spreader and allow to dry before storing.
• Gears are permanently lubricated at the factory. DO NOT open the gearbox at anytime as debris may enter
and interfere with functionality.
• When using rock salt and ice-melt products be sure to empty the hopper upon completion of spreading each
time you use it. These materials may reconstitute back into a solid block overnight with humidity. They can also
damage metal parts if exposed for extended periods of time.
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458

Publicité

loading