Thermador PROFESSIONAL 60 Serie Mode D'emploi page 18

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Integral Blower Installation Only
Integral Blower models are integrated into the hood at the
time of installation.
For complete installation instructions see the instructions
supplied with the blower unit.
1. The blower is attached to the hood using weld studs
provided on the mounting plate. Guide the motor
mounting plate over the studs (Figure 23).
2. Attach (4) nuts (included with hood) to the weld studs.
Tighten nuts to secure the blower to the hood.
Wiring the Hood with an
Integral Blower
inches (mm)
18⅞"
18⅞"
18⅞"
(473)
(473)
8¼"
8¼"
8¼"
(208)
(208)
(208)
Installation Instructions
Figure 23: Weld Stud Locations
10⅞"
10⅞"
10⅞"
(275)
(275)
(275)
13⅛"
13⅛"
13⅛"
(335)
(335)
Figure 24: Integral Blower Model
Integral Blower models are integrated into the hood at the
time of installation. For complete installation instructions
see the instructions supplied with the blower unit.
1. Remove junction box channel covering the wires (see
Figure 13 on page 13).
2. Remove circular knockouts.
3. Install strain relief (not included) into one of the circular
knockouts.
4. Connect the blower's Molex plug connector to the
connector present inside the hood, as shown in
Figure 25.
From Control Panel
Figure 25: Wiring the Hood with an Integral Blower
5. Connect the power supply wires to the hood wires in
the following order: black to black, white to white, and
green wire to green ground screw on chassis. Use
spring type wire nuts.
Spring type wire nuts rated for a minimum of two
(2) #18 gauge wires and maximum of four (4) #14
gauge wires, UL & CSA rated to 600V and 302°F
(150°C.)
6. Close the junction box cover.
From Blower
English | 17 |

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ph60gs

Table des Matières