Télécharger Imprimer la page

Riello 40 G7 Instructions Pour Installation, Utilisation Et Entretien page 35

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
BOILER FIXING
Put on the flange (1) the screw and two nuts, (see fig. 2).
Widen, if necessary, the insulating gasket holes (5), (see fig. 3).
Fix the flange (1) to the boiler door (4) using screws (2) and (if necessary) the nuts (3) interpos-
ing the insulating gasket (5), (see fig. 4).
Fig. 2
E9022
Fig. 3
D5012
Verify that the installed burner is lightly leaned
towards the button. (See figure 5).
The burner is designed to allow entry of the flexible
oil-lines on either side of the burner.
Fig. 4
1
5
1
2
D8058
3
GB
4
3
5
2
D5572
Fig. 5
2903360

Publicité

loading

Ce manuel est également adapté pour:

40 g10705m1706m1345203020006157