Lovato T-FAST ie40 Instructions Relatives À L'installation, L'utilisation Et La Maintenance page 23

Modules de production ecs
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION ON THE PUFFER
1
3.
Remove the EPP inserts for the hydraulic connection
as indicated in the picture
4
4.
Hook-up the module to the screws – Hook the module
up to the screws of the puffer (see slot on the back) and
Screwing the screws as indicated in the picture 5.
Assembling instrunctions and maintenance
ATTENTION!
!
HANDLE IT WITH CARE!
1.
1. Pull out the module from the package and remove the cover.
THE HOLES CENTER DISTANCE HAS TO BE
!
TRANSMITTED TO THE BOILER'S MANUFAC-
TURER WHEN PLACING THE ORDER (USE
THE DISTANCE IN THE PICTURE 3)
2.
Slacken the 2 screws of the support jig (pic.2) and remove
it from the back part of the module.
3
ATTENTION!
5
2
23

Publicité

Table des Matières
loading

Table des Matières