Installation/Connection/Setting Up; Installation; Connection Plan - Endress+Hauser eco-graph Mise En Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 72

3. Installation/connection/setting up

3.1 Installation

3.2 Connection plan:

40
3. Installation/connection/setting up
136 mm (5,354")
Prepare the required panel cut-out to 138
The unit installation depth is approx. 214 mm.
1. Push the unit through the front of the panel. In order to avoid overheating we
recommend a spacing of 10 mm to the rear and other units.
2. Hold the unit horizontally and fix the jack screws into their respective slots
(top/bottom or left/right).
3. Tighten the jack screws evenly using a screw driver.
Hint:
Further support is only required if the panel material is very thin.
Attention:
Should there be any possibility of high energy transients on long signal cables it is
recommended that an over-voltage protection unit be connected (e.g. HAW 560/562).
Please use screened cables when operating with the following signals:
• RTDs
• serial interfaces.
Power supply
Power supply 115...230 V, 48...63 Hz:
L:
Phase L
N:
Neutral N
PE:
Earth/ground protection cable
+1
+1
x 138
mm (according to DIN 43700).
Power supply 24...48 V, 0/48...63 Hz:
L+:
+ Power supply
(or alternating current
L-:
- Power supply
(or alternating current
PE:
Earth/ground protection cable

Publicité

Table des Matières
loading

Table des Matières