Preparation For Installation; Wall; Ceiling; Duct - Maico ECA 150 ipro Notice De Montage Et Mode D'emploi

Masquer les pouces Voir aussi pour ECA 150 ipro:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7 Preparation for installation

fan

• Fan / fan
• Amplifier / fan
For more technical data → rating plate.
For characteristic curves → www.maico-ventil-
atoren.com
7 Preparation for installation

7.1 Wall

Use mounting material suitable for base and of
sufficient dimensions. Ensure sufficient supply air.
The prescribed minimum distances to the
wall and the ceiling shown in the figure must
be observed.
1. Make sure the housing has a level base.
2. Fit wall breakthrough or drill core hole: Min-
imum diameter, 150 mm.
ð Recommendation: Fit WH 150 wall sleeve.
Fit a wall breakthrough with a minimum dia-
meter of 170 mm.
3. Lay the power cable to the installation location
(surface-mounted AP or flush-mounted UP),
for distance dimensions see above.

7.2 Ceiling

1. Perform installation preparations as described
in Chapter Wall.
28
30 m
40 m
NOTICE Danger of short-circuits and damage
to unit if condensation builds up in the fan
housing.
Thermally insulate ventilation ducts properly. Al-
low for a condensation drain or condensate col-
lector in the riser.

7.3 Duct

1. Deburr edges on the inside of the duct.
2. Perform installation preparations as described
in Chapter Wall.

8 Installation and commissioning

8.1 Fan
1. Unpack unit and take off cover.
2. To release the cover, push the catch upwards.
3. Fit supplied foam strip centred in socket.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Eca 150 ipro vzcEca 150 ipro hEca 150 ipro bEca 150 ipro rcEca 150 ipro rchEca 150 ipro k ... Afficher tout

Table des Matières