The special branch circuit breaker is installed in the permanent wiring. Always use a circuit
⑤.
that can trip all the poles of the wiring and has an isolation distance of at least 3 mm
between the contacts of each pole.
Perform wiring work in accordance with standards so that the air conditioner can be
⑥.
operated safely and positively.
Install a leakage special branch circuit breaker in accordance with the related laws and
⑦.
regulations and electric company standards.
The power source capacity must be the sum of the air conditioner current and the current
①.
of other electrical appliances. When the current contracted capacity is insufficient, change
the contracted capacity.
When the voltage is low and the air conditioner is difficult to start, contact the power
②.
company to raise the voltage.
5.5.2 Electrical Wiring
(1). For solid core wiring (Fig. 26)
1). Cut the wire end with a wire cutter or wire-cutting pliers, then strip the
insulation about 25 mm (15/16").
2). Using a screwdriver, remove the terminal screw(s) on the terminal board.
3). Using pliers, bend the solid wire to form a loop suitable for the terminal
screw.
4). Shape the loop wire properly, place it on the terminal board and tighten
securely with the terminal screw using a screwdriver.
(2). For strand wiring (Fig. 26)
1). Cut the wire end with a wire cutter or wire-cutting pliers, then strip the
insulation about 10 mm (3/8").
2). Using a screwdriver, remove the terminal screw (s) on the terminal board.
3). Using a round terminal fastener or pliers, securely clamp a round terminal
to each stripped wire end.
4). Position the round terminal wire, and replace and tighten the terminal
screw with a screwdriver.(Fig. 27)