Klarstein NEW BREEZE Mode D'emploi page 46

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
46
3. Aim the locating pole of joint B of heat discharge pipe at the opening of joint C;
rotate it slightly to make joint B and joint C connect tightly.
4. in order to improove cooling efficiency, the heat discharge pipe should be as short
as possible and flat withoutcurve to ensure smooth heat discharge.
5. Correct installation is as shown in figure. When installing it on a wall, height of hall
should be about 40 cm - 130 cm from floor.
6. If the pipe is bent too much, it would easily cause malfunctions.

Publicité

Table des Matières
loading

Table des Matières