Sanremo ZOE COMPACT SAP Livret D'instructions page 24

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ENGLISH
same reason be very careful when clamping the pump to mount or demount connectors.
9) Scale build up
Scale deposits will quickly show on inner components when using hard water, not sweetened with ion exchange resins.
Scale formation increases when the pressure relief valve is used as flow rate regulator: the rate of scale deposition increases with
increasing of closed loop circulation.
B – Steam tap knob
C – Water delivery
D – Main switch
0 – Off
1 – Pump and automatisms on
2 – Pump, automatisms and electric heating on
E – Filter holder
F – Filter holder insertion group
G – Power cable
MOD. ZOE COMPACT 2GR SED / SAP
M1 – Delivery of one short coffee
M2 – Delivery of one long coffee
M3 – Delivery of two short coffees
M4 – Delivery of two long coffees
M5 – Continuous delivery and settings button
M6 – Hot water delivery
N – Pump pressure gauge
P – Boiler pressure gauge
T – Cup warmer switch (optional)
24

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Zoe compact sed

Table des Matières