Electrical Connection - lamber F85 Instructions D'emploi

Masquer les pouces Voir aussi pour F85:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Second Section - FOR THE INSTALLER
During installation carry out a good machine levelling, which is a prerequisite for a correct
operation thereof.
The Manufacturer cannot assume any responsability for any damage to persons or
property deriving from the non-observance of the above specified norms.
For a correct installation see the drawing on page 30.

ELECTRICAL CONNECTION

Before connecting the machine,
make sure the voltage outlet of the
mains is the same as the voltage
specified on the data plate of the
machine.
A main switch must be installed between
the mains and the machine. This safety
measure also requires that the minimum
distance between the switch contacts is at
least 3 mm and the disconnection on all
poles according to EN 60204 (VDE 113).
Fuses on the main switch must be 16 A.
The mains must be wired to be able to
handle
the
current
machine.The system must also be provided
with a proper ground lead in accordance
with the existings norms. The electric cable
must be of the following type: H07RN-F.
For the right choice of the cross section
area refer to the following table:
Cross Section area
mm²
0,75
1
1,5
2,5
drawn
by
the
Total loading
A
< 6
6
10
÷
10
16
÷
16
25
÷
The electrical safety of this equipment is
only assured if it is connected as follows.
It is necessary to connect the equipment to
an
effective
ground
specified by the electrical safety regulations
in force.
Check that this basic requirement is
complied with and, in case of doubt, ask for
a careful check of the installation by a
qualified personal.
In addition, the equipment shall be part of
an equipotential system, the effectiveness
of which should be checked according to
the regulations in force.
The connection should be made at the
screw marked by the respective label
located on the equipment back side (
THE
MACHINE
CONNECTED WITH AN EFFECTIVE
GROUND CLAMP.
The manufacturer declines any
responsibility for any damages
caused by lack of an effective
ground installation.
ENGLISH
installation,
as
).
SHALL
BE

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

F92

Table des Matières