GMV GL MRL-MC Manuel D'entretien page 34

Ascenseur
Masquer les pouces Voir aussi pour GL MRL-MC:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 52
C) to ensure that a risk assessment for any working area and for any maintenance operation has been carried
out taking into account the installer's maintenance instructions and all information supplied by the owner of
the installation.
D) to inform the owner of the installation about any work to be carried out as a consequence of a risk
assessment especially for the access and/or the environment related to the building/installation.
E) to carry out a maintenance plan so that preventive maintenance is suitable for the installation and
maintenance time is as short as reasonably practicable, without reducing the safety of persons, in order to
minimize the non-operational time of the installation.
F) to adapt the plan for maintenance so as to take account of any predictable failures, e.g. those due to misuse,
mishandling, deterioration, etc.
G) to carry out maintenance operations by competent maintenance persons and provided with the necessary
tools and equipment.
H) to maintain the competency of maintenance persons.
I)
to carry out the maintenance periodically.
J) to provide a 24 hour, all year round call-out service for rescue of persons
K) to keep records of the result of each intervention due to a failure of the installation.
-
These records shall include the type of failures in order to detect any repetition. They shall be available
to the owner of the installation on request.
L) to put out of service the installation if the maintenance organization is aware of a dangerous situation,
detected during the maintenance, which cannot be eliminated immediately, and to inform the owner of the
installation of the need to keep it out of service until repaired.
M) to be organized to provide the necessary spare parts for any repair
N) to ensure the attendance of a competent maintenance person, given reasonable notice, for any inspection
carried out by an authorized third party or for building maintenance works to be carried out in the areas
reserved for the maintenance organization.
O) to inform in due time the owner of the installation about necessary progressive upgrading of the installation.
P) to organize rescue operations, even with subcontractor, and to make provision for circumstances such as
fire, panic, etc.
¥
"
Maintenance Manual
General Part
Pag. 6 di 6
Doc. n° 10991032
Rev.1.0.11
- 07.06.2006
0
EN
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gl mrlGl 81 21Gl tmlDoc 10991033

Table des Matières