Installation And Commissioning; Recommended System Layout; Locating The Equipment; Environment - Parker BAM10 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3 Installation and Commissioning

Only competent personnel trained, qualified, and approved by Parker domnick hunter should perform installation,
commissioning, service and repair procedures.

3.1 Recommended System Layout

The module should be installed, downstream of a 'wet' air receiver, with the pre-filtration supplied and optional condensate management
equipment to meet both the specification and local environmental requirements. This includes the following components:
Note. Failure to maintain the pre and after filtration will invalidate the warranty for the module.
1
Compressor
2
Wet air receiver
3
Isolation valve

3.2 Locating the Equipment

3.2.1 Environment

The equipment should be located indoors in an environment that protects it from direct sunlight, moisture, and dust. Changes in temperature,
humidity, and airborne pollution will affect the environment in which the equipment is operating and may impair the safety and operation. It is the
customers' responsibility to ensure that the environmental conditions specified for the equipment are maintained.

3.2.2 Space Requirements

The equipment should be mounted on a flat surface capable of supporting its own weight plus the weight of all ancillary parts. The minimum
footprint requirements are specified below, however there must be adequate space around the equipment to allow airflow and access for
maintenance purposes and lifting equipment. A minimum spacing of approximately 500mm (20 ins) is recommended around all sides of the
modules and 1000mm (39.4 ins) above it.
Do Not position the equipment so that it is difficult to operate or disconnect from the electrical supply.
4
Breathing Air Module
5
Outlet to system
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bam70Bam20Bam30Bam50Bam40

Table des Matières