Final Check - Haier GE Appliances USYM09UCDS Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

Final Check

Start Up Checklist
Refrigerant charge is verified and system has been
leak tested
Line sets have been insulated
Electrical connections are secure
Has the electrical ground been checked and verified
Electrical wiring terminals match at indoor and
outdoor unit
Wire between outdoor and indoor must be 14/4
stranded
The outdoor to indoor wires free of splices
Condensate drain has correct pitch and has been
leak tested
Explaining Operation to the End User
• Using the User Manual, explain to the user how to use the air conditioner/heat pump, (the remote controller,
adding/removing the air filters, placing or removing the remote controller from the remote control holder, cleaning
methods, precautions for operation, etc.)
• Review precautions for operation.
• Recommend that the user read the Operating Instructions carefully.
14
Indoor and outdoor units match
Indoor and outdoor units are firmly mounted
Power source voltage is within tolerances
The indoor and outdoor sections are quiet and free
of vibration
All functions of the controller have been verified
Operation in cooling or heating modes is normal
Operation of the system has been explained to the
owner
31-5000493 Rev. 1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ge appliances usym12ucdsGe appliances usym18ucdsGe appliances usym24ucdsGe appliances usym09ucds aGe appliances usym12ucds aGe appliances usym18ucds a ... Afficher tout

Table des Matières