Installation Instructions
Final Check
Start Up Checklist
□
Refrigerant charge is verified and system has been
leak tested
□
Line sets have been insulated
Electrical connections are secure
□
Has the electrical ground been checked and verified
□
Electrical wiring terminals match at indoor and
outdoor unit
□
Wire between outdoor and indoor must be 14/4
stranded
□
The outdoor to indoor wires free of splices
□
Condensate drain has correct pitch and has been
leak tested
Explaining Operation to the End User
• Using the User Manual, explain to the user how to use the air conditioner/heat pump, (the remote controller,
adding/removing the air filters, placing or removing the remote controller from the remote control holder, cleaning
methods, precautions for operation, etc.)
• Review precautions for operation.
• Recommend that the user read the Operating Instructions carefully.
14
□
Indoor and outdoor units match
□
Indoor and outdoor units are firmly mounted
□
Power source voltage is within tolerances
□
The indoor and outdoor sections are quiet and free
of vibration
□
All functions of the controller have been verified
□
Operation in cooling or heating modes is normal
□
Operation of the system has been explained to the
owner
31-5000493 Rev. 1