Glem GHI9100BK Mode D'emploi page 63

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. According to the hanging board, drill 12 holes in the ceiling, see pic 2, 12pcs of ST6*40mm
big flat screws will be used to fix the hanging board on the ceiling, and then 8pcs of M4*10
screws and M4 nut with washer will be used to connect the angle iron into the hanging
board.
5. See pic 1, calculated the length of the angle iron, and 16pcs M4*10 big flat screws and M4
nut with washer will be used to connect the angle iron and another angle iron ( the overlap
length of angle iron can not less 100MM)See pic 3.
6. 4pcs ST4*8 big flat screws will be used to connect the inside chimney into the hanging
board, then put on the outside chimney, two hooks will be used to put up the outside
chimney in order to the next installation, see pic 4.
7. Equip the v-flap to the outlet,and then dress the converter onto the outlet, see pic 5.
8. Adjust the 4 glass screws to check whether the glass and the cooker hood body connected
well and fixed, see pic 5.
63

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ghi9100ix

Table des Matières