Water Budget Programming - Rain Bird TBOS Serie Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 41
ENG
Transmitting time, date and program:
- Press the centre key of the field transmitter to return to the PROGRAMMING MENU screen.
- Select "Transmit" and confirm by pressing OK.

2. Water Budget Programming

You have the option of changing the watering time for each one of the 3 programs A, B and C and for each month.
Seasonal adjustment per program:
- Select "Water budget" and confirm by pressing OK.
- Then select "per program" and confirm by pressing OK.
- Then choose to which of the programs A, B or C to assign the water budget. Modify the permitted watering run
times in 1% increments (from 0 to 300%) and confirm by pressing OK.
By default:
100% = no change to watering run times
• > 100% = increase of watering run times
• < 100% = decrease of watering run times
Seasonal adjustment per month:
- Select "per month" and confirm by pressing OK.
- Change the watering run times for each of the months by fractions
and confirm by pressing OK. Programs A, B and C will be affected.
WARNING : Water budgets per program and per month are cumulative
Example of water budget:
- A valve programmed with a time of 10 minutes on program A and 20 minutes on program B.
- A water budget set at 50% on program. A and 200% on program B.
- Un water budget set at 300% for the current month.
=> The effective watering run time will be 15 min (10 x 50% x 300% = 15)
on program A and 120 min (20 x 200% x 300% = 120) on program B.
18

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tbos-ii serie

Table des Matières