Appendix A: Gas Pipe Escutcheon Installation And Analyzer Probe Location - Pentair MASTERTEMP 125 Guide D'installation Et D'utilisation

Masquer les pouces Voir aussi pour MASTERTEMP 125:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

54

Appendix A: Gas Pipe Escutcheon Installation and Analyzer Probe Location

APPENDIX A: GAS PIPE ESCUTCHEON INSTALLATION
Required Parts: P/N 467107, Gas Pipe Escutcheon (PVC), P/N 270114, Phillips Retention Screw (#8)
1. IMPORTANT! Turn off the electrical supply to the heater and turn off the pump.
WARNING! Risk of fire or explosion. Never test for gas leaks with an open flame.
The following escutcheon installation instructions are intended for new pool installations
only, not for retrofit purposes.
2. When installing the ¾" pipe into the gas valve, place the gas pipe escutcheon over the pipe so that the
larger circle is facing the heater's service panel and the smaller circle with the screw is facing away
for the heater service panel (toward the union) as shown in Figure 1.
3. Install the gas pipe as described in "GAS CONNECTIONS" on page 14.
4. Slide the escutcheon flush against the outside of the heater service panel and the gas pipe opening.
Be sure to completely cover large gas pipe opening in the panel to prevent rodents to gain access to
the inside of the heater.
5. Hand-tighten the retention screw to secure the escutcheon in place.
6. Safety check the gas pipe for leaks as instructed in GAS CONNECTIONS, PAGE 14, and BASIC
SYSTEM OPERATIONS, PAGE 32.
SERVICING: GAS COMBUSTION ANALYZER PROBE TESTING
A standard combustion analyzer probe will not fit in the openings in the top of the exhaust vent cover. The vents
have been reduced in size to limit rodent access. Do not force the probe in from the top of the exhaust vent cover,
use the 3/8-in hole on the lower right side of vent. See Figure 2.
MASTERTEMP 125 Pool and Spa Heater Installation and User's Guide
Escutcheon
Screw
Gas
Pipe
Figure 1. The escutcheon is
installed on gas pipe and must
cover the circular opening
in heater panel.
EXHAUST SIDE VIEW
Figure 2.
Exhaust vent cover
Insert gas combustion
analyzer probe in to the
3/8-in hole (right side
of vent)
Rev. C 3/2019

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

461058461059461060461061

Table des Matières