Mid - Conformity Declaration; Safety Instructions; Electro-Magnetic Interference; Care Instructions - Zenner zelsius C5-CMF Manuel De Montage

Compteur électronique d'énergie thermique et de frigorie avec capsule de mesure coaxiale
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Deutsch
English

MID - Conformity declaration

zelsius
C5-CMF is produced and
®
tested in compliance with the new
European Measuring Instruments
Directive 2014/32/EU (MID). Accor-
ding to this directive, devices are no
longer carrying an initial verification
stamp, but rather the year of the
device's declaration of conformi-
ty (recognizable on the front of the
device, for example: M16). The MID
controls the use of heat meters up to
the moment they are placed on the
market resp. their first putting into
use. After this, the national regula-
tions for devices subject to compul-
sory verification apply within the EU.
The duration of initial verification va-
lidity in Germany remains 5 years for
heat meters. After this period has ex-
pired the measuring device may no
longer be used for billing in commer-
cial use. The regulations resp. validi-
ty period may vary in other countries
of the EU.
If you have questions, please direct
them to
support@zenner.com
The declaration of conformity is at-
tached to each measuring instru-
ment. The latest information about
this product can be accessed or
downloaded from

Safety instructions

Electro-magnetic interference

zelsius
C5-CMF fulfils the national
®
and international requirements for
22
Français
www.zenner.com
interference resistance. To avoid
malfunctions due to other interferen-
ces, do not install fluorescent lamps,
switch cabinets or electric devices
such as motors or pumps in the im-
mediate vicinity of the meter. Cables
leaving the meter should not be laid
parallel to live cables (230V) (mini-
mum distance 0.2m).

Care instructions

Clean plastic surfaces with a damp
cloth only. Do not use any scouring
or aggressive cleaning agents! The
device is maintenance-free during
the service life. Repairs can only be
made by the manufacturer.

Installation instructions

Safety instructions for installa-
tion
Read these instructions carefully
right up to the end before starting to
mount the device! The installation
has to be done by qualified profes-
sional personnel. The current laws
and regulations have to be obser-
ved, especially the PTB technical
guidelines K8 und K9, EN1434 part
1+6, (in Germany also AGFW direc-
tive FW202, FW510, FW218 and
DIN4713 part 4 and the initial veri-
fication directive). At on devices with
M-Bus the respective regulations for
electrical installations have to be fol-
lowed. Make sure no heating water
escapes during installation – this
can cause burns! The connecting
threads may be sharp due to pro-

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Zelsius c5-asf

Table des Matières