Check Leakage; Gas Cylinder Numbers For Operation - Shizuoka Seiki Co. VAL6 GN5 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operation

Check Leakage

• Check all connections for leaks. Apply a soap and water solution to all connections and check for bubbles. If any
leaks are detected, retightening of connections is required immediately.
• Shut off the gas supply valve before refastening the connections.
• After repairing the leaks, retry to check connections for leaks with a soap and water solution.
Do not touch or adjust a brass pipe on solenoid valve. This is intended for maintenance person to
check the manifold pressure. If it is made any adjustment improperly, gas leakage may occur.

Gas Cylinder Numbers for Operation

Vaporization Rate
100 LB Propane Cylinders (approximate)
Maximum continuous draw in BTU per hour at various temperatures expressed in Fahrenheit.
This heater cannot be used at less than 144,000 BTU, thus keep supplied amount at over 144,000.
Lbs. of Propane in
Cylinder
100
90
80
70
60
50
40
30
20
10
INFORMATION ON SIZE * CAPACITY OR PROPANE GAS CYLINDERS:
The chart below shows the number and size of propane tanks needed to run this heater.
*Less gas is vaporized at lower temperatures.
You may need 2 or more 100 pound tanks or one larger tank in colder weather.
Temperature (°F) At tank
Above 32 °F (0 ºC)
20 °F (-6.7 ºC)
POINT:
Be sure to use a cylinder with vapor withdrawal.
11
1 Tank
167,000
152,000
137,000
122,000
109,000
94,000
79,000
66,000
51,000
38,000
32 °F (0 ºC)
20 degree F (-6.7 ºC)
2 Tanks
367,000
334,000
301,000
268,000
239,000
206,000
174,000
145,000
112,000
84,000
Number of Tanks
150,000 BTU/h
2 - 100 lb
2 - 100 lb
3 - 100 lb
3 Tanks
807,000
734,000
662,000
589,000
453,000
382,000
319,000
319,000
246,000
184,000

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Val6 gp5

Table des Matières