EN
power cable
S T E P 6
Install the stems onto the BEEM.
Feed the power cable through the
stem and install the stems into the
BEEM. Tighten them fully.
Carefully slide the ceiling rose over
the stems.
S T E P 7
Min 2 mm
Slide the stems with the BEEM
carefully
in
the
two-pieced
bracket.
Watch out that you do not damage
the cable.
Please ensure that the stems
protrude about 2 mm (1 inch).
S T E P 8
Using an Allen key, tighten both
halves of the collar around the
stems.
16
Heatsail BEEM®