4. Wall in the plate perfectly levelled.
5. Wait for the cement to set in the cavity.
6. Lay the electrical cables for connection to the accessories and the
electrical power supply (paragraph 2). To facilitate making the electrical
connections on the control unit, make the electric cables protrude by
about 20 cm from the hole on the foundation plate.
7. Secure the operator on the foundation plate, using the supplied screws
and washers as shown in Fig. 8. The operator's position is shown in Fig. 7.
When positioning the operator, route the electrical cables through the
hole on the base of the gearmotor body.
8. Route the connecting electrical cables through the hole on the base of
the unit's support, using the supplied cable gripper.
9. Make the electrical connections to the electronic control unit according
to the instructions for the unit.
1) Connect the earth cable of the system.
2) The operator is supplied for installation with the gate closing on the
right of the operator (looking from the inside) (fig. 5). If you require
left-hand closure, change over the connection of the cables con-
nected to the terminals of the motor.
Fig. 3
Fig. 4
The dimensions in the figures are in mm.
Fig. 5

3.3. INSTALLING THE RACK

1. PPrepare the rack (supplied on request), with the supplied Hex-head 8 x
25 screws, and spacers to be welded, as shown in Fig. 9. To avoid having
to weld on the gate, galvanised through-spacers and Hex-head 8 x 50
securing screws are available.
We advise you to tighten the securing screws of the rack on the top
end of the slot. This position will enable you to raise the rack when
the gate tends to lower through time.
2. Release the operator (see paragraph 6).