Adventys GL2 6000 FLR Guide D'utilisation page 17

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Mechtnictli inattlilittion:
For the integration of the kit in the top of the furniture , it is necessary to follow the instruction indicated
below.
1) Realize a cut out of : 331 x 606 mm. (Please respect the distance of 5cm with in the vertical walls).
2) Fixation of the frame (supply in the packaging) around the cut out under the work top.
(We recommend a strong mechanical assembly to be able to support a load on the vitro ceramic of 25Kg
by burner).This assembly can be realized by:
- Gudgeons welded under work-top then screwing on the frame(executive)
- Soldering of the frame under work-top
- Sticking of the frame under work-top
3) Place the kit in the cut out on the frame, then adjust the 4 screws in a way that the glass is flushed in
the work –top.
(We recommend that the position of the glass is equal or slightly lower than the work plan to avoid chip-
ping the glass when we make slide a pan).
4) Remove the KIT of the support.
5) Put down a joint of glue (CAF 99 for example) thermal high strength on the frame.
6) Reposition the Kit by centering it in the cut out.
7) Press slightly on the kit to put it there earthed up on 4 screws.
8) Let dry according to recommendation of the manufacturer of glue.
9) Realize a food seal (novasil type S56) between the top of furniture and the vitro ceramic glass.
10) Let dry according to recommendation of the manufacturer of seal.
11) Remove any residues of glue / joint from the point of view of work and the glass before quite started.
Page 17

Publicité

Table des Matières
loading

Table des Matières