Unpacking And Inspecting Of The Extraction Arm; Assembly Requirements; Recommended Mounting Material - Kemper 79 205 Notice De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 30
1.2

Unpacking and Inspecting of the Extraction Arm

1.3

Assembly Requirements

1.4

Recommended Mounting Material

4
M12
105
5
M12
105
6
M12
105
7
M12
130
Art. Nr.: 1502198
General Assembly
● Remove the packaging carefully.
● Check if delivery is complete. Use the delivery sheet.
● If any parts are missing or have been incorrectly delivered,
please immediately contact KEMPER GmbH or the supplier.
WARNING
Risk of injury due to falling components!
Components that are not adequately attached could detach
and cause serious injuries!
● For the mounting on walls, use only suitable
mounting material
● Mount the hinged cantilever for the extraction arm
4.0 - 7.0 m on suitable walls or columns.
● Observe the tightening torques of the screws
● Only use the supplied assembly material and the
recommended mounting material
Mounting material for the assembly on concrete
columns or walls
70
Fischer dowel
anchor bolt
70
Fischer dowel
anchor bolt
70
Fischer dowel
anchor bolt
100
Fischer dowel
Highbond anchor
FAZ 2 12/10
60
Reinforced
concrete C25/30
FAZ 2 12/10
60
Reinforced
concrete C25/30
FAZ 2 12/10
60
Reinforced
concrete C25/30
FHB dyn
40
Reinforced
12x100/25
concrete C25/30
310
200
310
200
310
200
450
200
1-2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

79 00779 70579 20679 50779 706

Table des Matières