Remove Cover Hood And Heat Insulation - Daikin Altherma EHS04P30B Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 164
4
x
Set-up and installation
Install the Daikin Altherma EHS(X/H) at the installation site.
– Recommended clearances (fig. 4-5):
To the wall: (s1)
100 mm, (s2)
From the ceiling (X): 1200 mm, minimum 480 mm.
– Carefully transport the Daikin Altherma EHS(X/H), use the
handles.
– When setting up the unit in a cabinet, behind panels or in
other restricted conditions, sufficient ventilation
(e.g., using ventilation gratings) must be ensured.
If necessary, install the optional Backup-Heater (EKBUxx)
into the Daikin Altherma EHS(X/H) (fig. 4-5).
Observe the assembly and operating manual supplied with
the accessory (
for tightening torque see chapter 10.3).
Fig. 4-5
Layout (shown on Daikin Altherma EHS(X/H) P50B with incor-
poration of the optional Backup-Heater)
Installation and operating instructions
20
4.3
500 mm.
Fig. 4-6
Fig. 4-7

Remove cover hood and heat insulation

Lift the cover hood at the back and remove to the front.
Removing the protective cover
Daikin Altherma EHS(X/H) without cover hood
CAUTION!
The thermal insulation (fig. 4-7, item A)
consists of pressure sensitive shaped
EPP components that can easily be
damaged by inappropriate handling.
Carry out removal of the thermal
insulation only in the sequence and in
the directions quoted below.
Do not use force.
Do not use tools.
Daikin Altherma EHS(X/H)
Daikin Altherma integrated solar unit
008.1441399_02 – 01/2021 – EN

Publicité

Table des Matières
loading

Table des Matières