Leveling; Complete Installation; Water System Preparation - Dacor RF36NDFSS Instructions D'installation

Masquer les pouces Voir aussi pour RF36NDFSS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Leveling

1.
Move the refrigerator to its final location.
NOTE: To allow the refrigerator to roll easier, raise the
leveling legs off the floor by turning the leveling screws
counterclockwise. The front rollers will be touching the floor.
2.
So the doors will close
easier, use a 1/4" hex
driver to turn both leveling
screws clockwise. This
will raise the front of the
refrigerator tilting it slightly
downward to the rear. Turn
both leveling screws the
same amount.
NOTE: Having someone
push against the top of the
refrigerator takes some
weight off the leveling
screws. This makes it easier to turn the screws.
3.
Open and close the doors to make sure they close as easily
as you like. If not, increase the tilt by turning both leveling
screws clockwise. It may take several turns of the leveling
screw to allow the doors to close easier.
4.
Check for door alignment. If one door is lower than the other,
adjust the leveling screw, on the lower side of the refrigerator.
Using a 1/4" hex driver, turn the screw clockwise to raise that
side of the refrigerator until the doors are aligned. It may take
several turns of the leveling screw to raise the refrigerator.
NOTE: Having someone push against the top of the
refrigerator takes some weight off the leveling screws. This
makes it easier to turn the screws.
5.
Make sure the refrigerator is steady. If the refrigerator seems
unsteady or rolls forward when the door or drawer is opened
adjust the leveling screws. Using a 1/4" hex driver, turn the
leveling screw on each side clockwise until the rollers are up
and the leveling feet are firmly against the floor.
6.
Replace the base grill by aligning the holes in the grille with
the holes in the cabinet and fasten using the screws.

Complete Installation

1.
Turn the water supply line valve to the open position.
2.
Wait a few minutes. Check the water line connections for
leaks.
3.
Remove all boxes, parts packages and packing materials
from the interior of the refrigerator.
4.
Remove the film and cardboard from the grill and doors or
door frame, depending on your model.
5.
Install the shelves and bins in the refrigerator and freezer
compartments.
8
Installation Instructions
6.
The controls are preset at the factory to the midpoint setting.
Check that the compressor is operating properly and that all
the lights are working.
7.
Flush the water system before use. See Water System
Preparation.
To get the most efficient use from your new refrigerator, read your
use and care manual. Keep these installation instructions and the
use and care manual near the refrigerator for easy reference.

Water System Preparation

Please read before using the water system.
Immediately after installation, follow the steps below to make sure
that the water system is properly cleaned.
NOTICE: Flush four (4) gallons of water through the water filter
cartridge before use. Allow 24 hours for the refrigerator to cool
down and chill water.
Do not use with water that is microbiologically unsafe or of
unknown quality without adequate disinfection before or after
the system. Systems certified for cyst reduction may be used on
disinfected waters that may contain filterable cysts.
1.
Install the water filter. The water filter is located in the upper
right hand corner of the fresh food compartment. Remove
the blue bypass cap and retain it for later use. Remove the
sealing label from the end of the filter and insert it into the
filter head. Rotate it gently clockwise until it stops. Snap the
filter cover closed.
2.
Hold a sturdy container
under the water spout and
press the dispenser button.
Flush the water system by
dispensing and discarding
4 gallons (15 L) of water.
Cleaning the system will take
approximately 5 minutes
and will help clear air from
the line. Additional flushing
may be required in some
households. As air is cleared
from the system, water may
spurt out of the dispenser.
3.
Make sure the ice bin is in
place and the ice maker
arm is down.
4.
After the freezer section
reaches between 0° to 2°F
(-18° to -17° C), the ice
maker fills with water and
begins operating. You will
have a complete harvest
of ice approximately every
three hours.
5.
Allow approximately 24
hours after installation to
receive the first batch of ice.
6.
Allow 3 days to completely fill the ice storage bin. Discard the
first three batches of ice produced.

Publicité

Chapitres

Table des Matières
loading

Table des Matières