Daily Operation And Maintenance - Gree GRS-CQ8.0Pd/NaE-K Manuel D'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SPLIT
TYPE
No.
Cut off all temporary power supply, resume all the insurance and check the electricity for the last time.
1
Check the power supply and voltage of the control circuit; _____V must be ±10% within the range of rated
operating power.
No.
1
Check all the conditions needed to start up the unit: oil temperature, mode, required load etc.
Start up the unit, and observe the operation of compressor, electric expanding valve, fan motor and water
pump etc.
2
Note: the unit will be damaged under abnormal running state. Do not operate the unit in states of high
pressure and high current.
Others:
Items for
acceptance after
debugging

21. Daily Operation and Maintenance

In order to avoid damage of the unit, all protecting devices in the unit had been set before delivery, so please do
not adjust or remove them.
For the first startup of the unit or next startup of unit after long-period stop (above 1 day) by cutting off the power,
please electrify the unit in advance to preheat the unit for more than 8 hours.
Never put sundries on the unit and accessories. Keep dry, clean and ventilated around the unit.
Remove the dust accumulated on the condenser fin timely to ensure performance of the unit and to avoid stop
of the unit for protection.
In order to avoid protection or damage of the unit caused by blockage of the water system, clean the filter in
water system periodically and frequently check water replenishing device.
In order to ensure anti-freezing protection, never cut off the power if ambient temperature is below zero in winter.
In order to avoid frost crack of the unit, water in the unit and pipeline system not used for a long period should
be drained. In addition, open the end cap of the water tank for drainage.
When the water tank has been installed but the water tank is set to "Without", functions relative with the water
tank will not work and the displayed water tank temperature will always be "-30". In this case, the water tank would
suffer frostbite and even other severe influences under low temperature. Therefore, once the water tank has been
installed, the water tank must be set to ''With", otherwise GREE will not be responsible for this abnormal operation.
Never frequently make the unit on/off and close the manual valve of the water system during operation of the
unit by users.
Ensure frequent check to the working condition of each part to see if there is oil stain at pipeline joint and charge
valve to avoid leakage of refrigerant.
If malfunction of the unit is out of control of users, please timely contact with authorized service center.
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Estimation or suggestion on the general running situation: good, modify
Identify the potential problem (nothing means the installation and debugging are in accordance
with the requirements.)
a. problem of power supply and electric control system:
b. problem of load calculation:
c. outdoor refrigerant system:
d. noise problem:
e. problem of indoor and piping system:
h. other problems:
During operation, it is needed to charge for the maintenance due to non-quality problems such as
incorrect installation and maintenance.
Is the user trained as required? Please sign. Yes( ) No( )
Air-to-water Heat Pump Split Versati
Ready to start
Start up the unit
Acceptance
55

Publicité

Table des Matières
loading

Table des Matières