Mount The Transformer To The Parent Machine - Nordson ProBlue P4 Manuel

Générateurs d'adhesif
Table des Matières

Publicité

E‐10
400/480 Volt ProBlue Adhesive Melters

Mount the Transformer to the Parent Machine

Sub‐base
Part 1024496_05
The transformer is shipped with a sub‐base that is used to mount the
transformer/melter to the parent machine.
NOTE: If you are converting an existing 230 volt ProBlue melter installation
to a 400/480 volt ProBlue installation, you must use the sub‐base provided
with the transformer.
NOTE: The transformer (with sub‐base) can be mounted directly to any
parent machine that is already configured for mounting either a model 3100V
or a model 3400V adhesive melter.
To mount the transformer
See Figure E‐5.
1. Attach the sub‐base to the parent machine using four 8‐mm (
bolts with locking hardware (customer supplied).
2. Remove the 1‐inch conduit knockout from the sub‐base and install the
cable clamp that is provided in the installation kit.
3. Mount the transformer onto the sub‐base, and then lock the transformer
to the sub‐base by turning both of the locking screws clockwise until they
stop.
NOTE: Ensure that the ground leads between the transformer chassis and
the power distribution module and between the transformer chassis and the
transformer lid are connected before replacing the lid.
5
/
‐inch)
16
E 2011 Nordson Corporation

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Problue p7Problue p10

Table des Matières