(3) It is strongly recommend to do the drain test before ceiling decoration.

2.4 Installation of Air Duct

NOTES
① There should be insulating layer on air-out duct, air-return duct and fresh air duct to avoid
heat loss and moisture. Adhere a nail on the air duct and then add thermal sponge with a
layer of tin. Fasten it with a nail cover and then seal the junction with tin tapes. You can
also use other materials that have good insulation quality.
② Each air-out duct and air-return duct should be fixed on a pre-made board with iron frame.
The junction of air duct should be well-sealed in order to prevent air leakage.
③ The design and construction of air duct should comply with national requirements.
④ The edge of air-return duct is suggested to be more than 150mm(5-7/8 in.) away from the
wall. Add a filter to the air-return opening.
⑤ Please consider noise-damping and vibration damping for the design and construction of
air duct. Besides, noise source must be away from people. For instance, do not have the
air-return opening installed on top of the user (Offices, rest area, etc.).
2.4.1 Installation of Air-out Duct
(1) Installation of the Rectangular Duct
No.
1
2
3
4
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Fig.10
Name
Hanger Rod
Return Air Duct
Canvas Duct
Return Air Inlet
6
Fig.9
No.
5
Static Pressure Box
6
Main Supply Air Duct
7
Name
Supply Air Outlet