Control Measurement Of The Trolley; Installation Of The Hinged Bearing On The Trolley; Replacing Shaft Protection - Hedson DRESTER GP 24 Manuel Technique

Masquer les pouces Voir aussi pour DRESTER GP 24:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

22. Control measurement of the
trolley
Place the trolley on a level floor and measure from the
floor up to the top of the guide on the trolley.
Max 123mm
Min 115mm
23. Installation of the hinged
bearing on the trolley
1. Install and tighten the nuts lightly and make sure that
there is no gap between the two bearing pieces.
No gap
2. Tighten the nut in the following order:
Nut 1: ¼ turn
Nut 3: ¼ turn
Nut 2: ¼ turn
18
1
2
3
24. Replacing shaft protection cyl 6
24.1 Components
24.2 Tools
13mm
NOTE: Start instruction with chapter 1 safety precautions
1. Remove clips.
1
EN
x 2
230756 rev 1

Publicité

Table des Matières
loading

Table des Matières