Hornbach 10179647 Manuel D'installation Et De L'utilisateur page 104

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
Awning 1x
Measure the distance between
the outsides of the articulated
arm brackets.
Mounting bracket 2x
(e.g. in concrete)
The mounting brackets 2 must
be installed level and at least
250 cm above the ground.
The distance between the in-
sides of the mounting brackets 2
is x + 4 cm.
Mark the installation holes of
the mounting brackets 2 on the
According to your wall type, drill
the holes and install the fasten-
Install the mounting brackets
2 at the fastenings and check
them for secure fixation.
Alternatively the mounting
brackets 2 can be installed to
a ceiling, using its two upper
104
|
ENGLISH
1
2
5 cm
wall.
3
ings.
holes.
Outside of brackets = x
Only for version 10179662
and 10179648: Fix the third
mounting bracket centered
between the outer brackets.
=
x + 4 cm
=

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10179648101796501017966110179662

Table des Matières