Installation Overview - Napoleon Vector Serie Manuel D'installation

Masquer les pouces Voir aussi pour Vector Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

general information
EN
1.3

installation overview

11
12
Recommended installation steps:
1. Determine venting requirements before deciding the fi nal location of the appliance.
2. Plan out appliance enclosure, framing, fronts, accessories, etc.
3. Install rough framing (refer to "rough framing" section).
4. Place the appliance in its fi nal position.
5. Install nailing tabs (refer to "nailing tab installation" section).
6. Install appliance venting (refer to "venting installation" section).
7. Install vent shield (refer to "vent shield installation" section).
8. Install all electrical wirings (refer to "electrical information" section).
9. Install gas lines (refer to "gas installation" section).
10. Test appliance.
11. Complete framing (refer to "fi nish framing" section).
12. Finishing (refer to "fi nishing" section).
13. Complete installation checklist in the owner's manual and apply serial number to owner's manual.
note:
For Dynamic Heat Control™ installation steps, refer to the leafl et provided with the Dynamic Heat Control™ kit.
Start Dynamic Heat Control™ installation before step 3 (place the appliance in its fi nal position)
8
W415-2034 / C / 04.21.21
5
8
9
4
6
3
7

Publicité

Chapitres

Table des Matières
loading

Table des Matières