Napoleon Vector Serie Manuel D'installation page 51

Masquer les pouces Voir aussi pour Vector Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

see-thru built out
note:
Shaded components (fi nish framing) must be
non-combustible materials.
Finish framing must be built after the appliance has
been placed in its fi nal position and venting
connected.
minimum framing
Ref
LV38-1
E
N* / **
O*
P*
* Finishing material must be considered with the protrusion (i.e. P includes framing and fi nish material). If desired, side
and bottom protrusions can be done with 4" (10.1cm) Max.
** This is a recommended minimum dimension when mounting heat-sensitive objects above the appliance, see
"fi nishing" and "minimum combustible mantel clearances" sections particularly when mounting electronic objects.
Otherwise, the built out section can be as minimal as desired.
note:
The LV series requires a minimum enclosure/ceo;omg height, as illustrated (dimension L), measured from the
bottom of the appliance. For temperature requirements, this area must be left unobstructed. Some venting
confi gurations that require more vertical rise will require a larger enclosure to provide minimum vertical clearance
between vent pipes and combustibles.
fi nish framing - after appliance installation
Drywall
N
O
Insulation
LV50-2
LV62
16 3/16" (41.1cm)
14 1/4" (36.2cm)
25 11/16 (65.2cm)
4" (10.1cm) Max
Ceiling
E
LV74
EN
P*
51
W415-2034 / C / 04.21.21

Publicité

Chapitres

Table des Matières
loading

Table des Matières