Heat Pump Installation; Transport And Handling; Dimensions And Connections - GeoSmart NETZERO BW Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. Heat pump installation

2.1. Transport and handling

The heat pump must be transported vertically and not exposed to adverse weather conditions. It can be lain carefully on its rear side
to facilitate transportation to the installation site.
Do not tilt the heat pump more than 45º, since this could impair proper equipment operation.
Due to its heavy weight, the heat pump should be handled by two workers using a forklift for heavy
NOTE
loads.

2.2. Dimensions and connections

The overall dimensions and hydraulic connections of the NETZERO CW and NETZERO BW heat pumps are described below.
12
10
300
Figure 2.1. Overall dimensions and hydraulic connections of the NETZERO CW model (Amounts in mm).
GEOSMART ENERGY
11
600
7
Installer manual NETZERO
545
475
125
55
3
2
1
4
9
7
8
175
300
425

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Netzero cw

Table des Matières