Drain Piping - Daikin UATYQ250MCY17 Manuel D'installation

Conditionneurs d'air en toiture
Table des Matières

Publicité

D
Unit Lifting
l
Holes at 4 corners of the unit base are used for unit
lifting purpose.
l
The spreader bar shall be slightly wider than the
unit width.
l
The insulation should be added at 4 corners of the
chain to prevent the damage of the panel when
lifting.
ü
Unit shown in diagram is UATYQ250.
ü
Other models will follow the same method in lifting.

Drain Piping

E
l
A 1" MPT condensate drain fitting is provided. The drain
pipe can be led out at the front side.
l
The drain pipe must be provided with a trap on the
outside of the unit and also installed at an incline for
proper drainage, as shown in the right.
l
To prevent condensate formation and leakage, provide
the drain pipe with insulation to safeguard against
sweating.
l
Upon completion of piping work, check that there is no
leakage and that the water drains off properly.
16
Lifting beam
Chain
The drain piping should have a drain trap.
A
≥ 70mm
B
≥ 2C
Drain trap
C
≥ 2 X ESP
ü
ESP = External Static Pressure
Drain trap for condensate
Spreader
bar
Lifting
holes for
shackle
(4 corners)
Drain piping
The drain pipe should
extend below this level.

Publicité

Table des Matières
loading

Table des Matières