Signs On The Appliance; Start-Up Procedure - Vortice VORT QBK Notice D'emploi Et D'entretien

Masquer les pouces Voir aussi pour VORT QBK:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ENGLISH
12
12
velocità minore
low speed
U2
V2
W2
U1
V1
W1
L1
L2
L3
N.B.
• The installer is responsible for connecting optional
safety devices that automatically turn the appliance
OFF when the inspection panel is opened. The
installation of micro-switches, like any other
electrical safety device fitted, must completely stop
the appliance from operating. Should this happen,
the power supply to appliance can only be restored
by manually turning the appliance switch back ON
and by returning power to it from the mains board.
• The earth connection must be made using the
special terminals inside the appliance and in
complete
accordance
requirements.
Earthing the appliance is an absolutely essential to
comply with the safety standards aimed at
preventing electrical accidents.
If the appliance is not earthed or is improperly
earthed, the manufacturer will not be held
responsible for any harm or damages caused by an
electrical accident.
• The installer is responsible for activating any safety
devices on the appliance in accordance with the EC
Machinery Directive.
• All the wiring and electrical components used in the
installation must comply with current European and
local legal requirements.

Signs on the appliance

A number of signs may be present on the appliance
and these must never be removed (Fig 13).
These signs may be:
• danger and information signs;
• danger signs;
• identification marks;
• prohibition symbols; (only for VORT QBK POWER
models)
18
VORT QBK POWER 9/7 2V 0,25
VORT QBK POWER 9/7 2V 0,37
VORT QBK POWER 9/7 2V 0,55
VORT QBK POWER 9/7 2V 0,75
VORT QBK POWER 9/9 2V 0,37
velocità maggiore
max speed
VORT QBK POWER 9/9 2V 0,55
VORT QBK POWER 9/9 2V 0,75
VORT QBK POWER 9/9 2V 1,1
L1
L2
L3
VORT QBK POWER 10/10 2V 0,55
VORT QBK POWER 10/10 2V 0,75
VORT QBK POWER 10/10 2V 1,1
VORT QBK POWER 10/10 2V 1,5
U2
V2
W2
VORT QBK POWER 12/12 2V 0,75
VORT QBK POWER 12/12 2V 1,1
VORT QBK POWER 12/12 2V 1,5
U1
V1
W1
VORT QBK POWER 12/12 2V 2,2
with
current
legal
VORT QBK POWER 15/15 2V 1,1
VORT QBK POWER 15/15 2V 1,5
VORT QBK POWER 15/15 2V 2,2
VORT QBK POWER 15/15 2V 3
VORT QBK POWER 18/18 2V 1,5
VORT QBK POWER 18/18 2V 2,2
VORT QBK POWER 18/18 2V 3
VORT QBK POWER 18/18 2V 4
VORT QBK POWER 18/18 2V 5,5
VORT QBK POWER 560 2V 3
VORT QBK POWER 560 2V 4
VORT QBK POWER 560 2V 5,5
VORT QBK POWER 560 2V 7,5
VORT QBK POWER 630 2V 4
VORT QBK POWER 630 2V 5,5
VORT QBK POWER 630 2V 7,5
VORT QBK POWER 630 2V 9,2
VORT QBK POWER 630 2V 11
13
13

Start-up procedure:

• Make sure that there are no foreign bodies or dirt
near the fan blades.
• Check that the air inlet and outlets are clear.
• Make sure that the safety systems are reliable and
working properly by repeatedly testing them to
ensure they turn the appliance OFF and that the
power supply is disconnected. We recommend that
you test that the system is working properly at least
three times.
• Check that the pulley is properly aligned and
securely fixed on the shaft (QBK POWER).
• Make sure that the fan blades turn in the same
direction as shown by the arrow on the side of the
shield.
• Run the appliance for 120-180 minutes then check
the belt drive tension. If it needs adjusting, follow
the procedure described later (QBK POWER).
• Measure the power absorption and compare it with

Publicité

Table des Matières
loading

Table des Matières